Does a similar extension elsewhere establish this project’s cost?
No. Existing conditions, design and completion scope can differ. Use examples for preferences rather than as an equivalent specification.
Can services affect an internal alteration?
Existing services can pass through the wall, floor or ceiling affected by an alteration. Their location, condition and any proposed change may need investigation by the relevant specialist before construction is settled. Identify what is known and allow unresolved items to be stated in the quotation. A visually modest alteration can therefore involve more than removing or rebuilding the visible surface.
Should the quotation identify protection of retained areas?
Clarify the expected arrangements and making good. They should not be left as assumptions around the central building work.
Can a contractor guarantee the final price from a rough floor area?
A floor area can support an initial budget discussion, but it does not define foundations, structure, services, finishes or site conditions. A firm quotation needs a clear specification and stated assumptions. Ask which costs are fixed, which are provisional and what information is needed to resolve them. Comparing early figures is useful only when their limits are understood and equivalent work is being discussed.