Does a previous extension establish what another property can do?
No. Each proposal depends on its own building and relevant requirements. Use examples for ideas rather than as permission or technical evidence.
Should changing drawings trigger a scope review?
A drawing change should trigger a review of the affected specification, quantities, products, approvals and sequence. Make clear which revision replaces the earlier one and who has authorised it. Ask for the cost and programme effect before changed construction proceeds. A small-looking alteration can affect connected work, so keep the accepted scope and design information aligned rather than allowing different contractors to follow different versions.
Can a firm programme ignore outstanding design requirements?
No. Dependencies and scope need consideration before reliable working arrangements can be agreed for the project.
Should I request a fixed quote while the design is still changing?
You can discuss feasibility and budgets, but a reliable fixed scope needs sufficiently settled information. Changes to footprint, openings, materials or services can affect the price and sequence. Ask which assumptions the estimate uses and which decisions must be resolved for a firm quotation. Keep design revisions coordinated and obtain any required professional or authority decisions before authorising work that depends on them.